Electric Closeout

Form EC-CR-01 · Commissioning release workpaper
Release status Calculating
Trade Tools ↓

Project -

Test date -

Ledger 0 systems

0 ready 0 held 0 incomplete

Not saved yet

STEP 1 · INTAKE CONTROLS [INPUTS] Updates live as you type

Combine field readings and checks into a release schedule that shows which electrical systems are ready and what still blocks closeout.

Sample scenarios · click to load

100% Free Core Engine

100% Free Core Engine · Diagnostic math and raw CSV export included with no credit card required.

01 · Project & Release Scope
Site, owner & instrument details Optional
02 · System Verification Ledger

One entry per system or piece of equipment. Torque, insulation resistance, phase rotation, and labeling are required on every entry. Items marked Corrected & re-tested also require a correction note and their own re-test evidence; notes on as-found items are optional.

Insulation acceptance used by this workpaper: at least 100 MΩ passes, 25 to 99.9 MΩ holds, below 25 MΩ is critical. Where the manufacturer or project specification sets a stricter value, record it in the item note and hold the item yourself.

03 · Evidence & Sign-off

Evidence register

Evidence is attached on each ledger entry and only counts for that entry. Files stay in this browser (up to 1 MB each).

    General field notes Optional

    Electric Closeout assists documentation. It does not replace manufacturer instructions, project specifications, the authority having jurisdiction, or review by a qualified electrical professional.

    Calculating

    Calculating

    Calculating release status

    0Ready
    0Held
    0Incomplete

    STEP 2 · YOUR CLOSEOUT RECORD [LIVE OUTPUT]

    Commissioning Release Schedule

    Form EC-CR-01 · Draft workpaper

    Project
    -
    Facility
    -
    Electrical contractor
    -
    Test date
    -
    Prepared by
    -
    Commissioning authority
    -

    Calculating

    Calculating release status

    System release schedule

    Select a row or reading to edit its source entry.

    # System Torque IR (MΩ) Rotation Labeling Evidence State

    Compliance checks

    CheckPassFailOpen

    Audit trail

    This browser session, newest first.

      Next actions

        Assumptions

          Supporting evidence

            Field notes

              Show the math

                Sign-off

                Prepared by
                Reviewed by

                Prepared with Electric Closeout

                Draft documentation aid. Does not replace manufacturer instructions, project specifications, the authority having jurisdiction, or review by a qualified electrical professional.

                Official certification seal

                This draft carries the free watermark. Pro issues the unwatermarked certification with your organization branding, controlled sign-off, and reusable closeout records for $19 per month.

                Start Pro · $19 per month
                Calculating

                Electric Closeout Pro

                Pro is $19 per month. The release calculation, schedule, CSV, and draft print stay free.

                CapabilityFreePro
                Core release calculationIncluded, every systemIncluded
                CSV exportRaw CSV with blockersRaw CSV with blockers
                Printed documentDraft with watermarkUnwatermarked official certification
                Branding & sign-offBlank signature linesOrganization branding and controlled sign-off
                Reusable recordsOne workpaper in this browserReusable closeout records and templates
                Start Pro · $19 per month

                Checkout opens in a new tab, so this workpaper stays open. Pro features turn on only after your license is verified.

                Replace your workpaper?

                Loading this sample replaces the entries and evidence you have typed. You can keep your work instead.